Entrada Del Rio Subdivision, Phase 2 & 4 Replat

Posted: July 6, 2018

A replatting of Phase 2 and 4 of this 559 lot subdivision in Rancho Sahuarita. The task for this project was to replat two phases with a reduced lot size which generated an increase of 55 lots. These two phases make up 161 lots of the total lot count.With the newly approved layout, we provided the engineering services for all of the improvement plans including grading plans, paving and sewer, and water plans.

Entrada Del Rio
Entrada Del Rio